Sill gorge exploratory tunnel, Ahrenthal access tunnel and Ampas access gallery

The construction of the Brenner base railway tunnel is a joint project between Austria and Italy for both passenger and freight traffic.

#Shortfacts

Location
Austria
Construction period
05/2010 - 2014
Client
Consortium EKS Brenner Nord, Swietelsky Tunnelbau GmbH
Executing companies
RS safetec
Contract value
290.000 EUR

Sill gorge exploratory tunnel, Ahrenthal access tunnel and Ampas access gallery

Client:Consortium EKS Brenner Nord
Location:Austria
Construction period:05/2010 - 2014
Executing companies:RS safetec
Contract value: 290.000 EUR

The Brenner base tunnel (BBT) crosses the Alps along the Munich-Verona axis between Innsbruck and Franzensfeste/Fortezza. With its length of 55 kilometers, it will be the second longest tunnel in the world, once the connection has been made.

Tunnel lengths:
Ampass: 1.350 m
Sill gorge to the Ahrental crossing: 3.300 m
Ahrental to the Sill gorge crossing: 2.400 m

 

Installation of

  • 45 Cable distribution cabinets
  • 45 Emergency telephones
  • 20 WLAN access points
  • 45 RFID-Readers to track access and locate
  • Approx. 30 km fibre optic cables (Multi- and Single mode)
  • 3 Master units und 3 base stations
  • 10 Optic remote units (repeaters)